Made-to-order entrance systems · Project and trade enquiries welcome

Solutions · Made to order

Configure the entrance as a project system—not a fixed shelf product.

The 1P1 approach coordinates opening conditions, door and frame construction, finish, hardware, sealing and smart access. Commercial terms, documentation and destination requirements are then confirmed through the enquiry.

Configurable EPIN TOMCIM architectural entrance

A considered process

From an architectural intention to a buildable entrance.

The product, opening and project requirements are reviewed together. Unknown details can be resolved step by step before configuration and quotation are confirmed.

Start with your brief

Capabilities

One clear path through the details.

01

Project definition

Opening size, wall condition, handing, application and visual references can be captured before engineering review.

02

Configurable construction

Door leaf, frame, cladding, handle, lock, access control, concealed-hinge and finish options can be organized as project-selectable fields. Feasibility depends on model, size and destination requirements.

03

Manufacturing & quality

The catalogue describes precision sheet-metal production and modular flexible customization. Inspection plans, tolerances and hold points should be agreed for each order and supported by the available records.

04

Export-ready handoff

Packing, documentation, shipment and after-sales requirements are confirmed during the enquiry.

Your next step

Have drawings, dimensions or simply a reference image?

Send what is known now. Missing details can be completed during follow-up.