Every detail is engineered for lasting comfort, security and character.

For architects & designers

From design intent to a buildable entrance

Bring the opening, elevation and architectural intent. EPIN TOMCIM coordinates the entrance system, manufacturing information and project-specific evidence needed for review.

Start a design review
Architectural entrance design visualisation by EPIN TOMCIM

Project support

Useful information at the right design stage

Feasibility & opening review

Review door size, frame size, rough opening, handing, swing, wall build-up and threshold conditions before the configuration is fixed.

System & finish coordination

Coordinate the leaf, frame, surround, glazing, finish, hardware and access control as one entrance composition.

Drawings & project files

Prepare the relevant elevation, section, fixing information, specification sheet and available CAD / BIM files for the selected system.

Verified technical evidence

Match available test reports and certificates to the quoted system, dimensions, hardware and destination requirement.

Coordination sequence

A clear route from reference to release

The level of detail increases with the project. Early concepts can start with incomplete information; manufacturing release requires an approved opening and configuration.

  1. 01Share the design intentSend an elevation, opening schedule, reference image or early-stage concept.
  2. 02Confirm the project basisDefine location, quantity, dimensions, opening method and performance priorities.
  3. 03Review feasibilityOur team identifies the closest system, non-standard requirements and evidence gaps.
  4. 04Coordinate the entranceFinish, hardware, threshold, sealing, glazing and access control are resolved together.
  5. 05Release project filesApproved drawings and applicable documents are issued against the confirmed configuration.

Project files

Request only the documents that apply to the selected doorset

Specifications, drawings, certificates and test reports are linked to a defined system and configuration. Generic marketing claims are not substituted for project evidence.